A Harvard-led study associates 403 US hyperscale data centres with an estimated 25.7 million tonnes of annual carbon dioxide emissions.

The research covers May 2024 to April 2025 and includes cloud computing as well as AI.

Its findings put electricity sourcing and facility transparency at the centre of the digital infrastructure debate.

A digital footprint measured in electricity

A Harvard-led study estimates that 403 US hyperscale data centres were associated with 25.7 million metric tonnes of carbon dioxide emissions from May 2024 to April 2025.

The research examines the electricity behind large computing facilities as investment in AI expands.

The figure is not an AI measurement alone.

  • The facilities also support general cloud computing, and the researchers could not separate electricity used for AI-specialised operations from other workloads.
  • Nor does the sample represent every US data centre.

For African markets developing their own digital infrastructure, the relevance is a planning question rather than a direct emissions comparison: what additional electricity will a facility require, where will that power come from, and how will its effects be disclosed?

What the researchers estimated

The team assembled a facility inventory using satellite imagery and modelled different operating conditions.

  • It then used US Environmental Protection Agency information to attribute electricity-related emissions according to regional generation mixes.
  • This approach addresses limited access to facility-level operating data.

The associated electricity-use range was 68 – 99 terawatt-hours. OneStop ESG reports a central estimate of about 82 TWh and an emissions range of 21 – 31 million tonnes of CO₂.

  • These ranges reflect operating assumptions rather than meter readings from every site.

According to the report, about 54% of the electricity was fossil-generated.

  • In her explanation of the research, co-author Francesca Dominici describes how equivalent electricity demand can produce different carbon footprints depending on the regional power mix.
  • Location and power sourcing therefore matter alongside computing efficiency.

Building useful computing with accountable power

The research offers a useful way to question infrastructure proposals.

  • A project promising jobs and digital capacity should also explain its expected load, connection arrangements and electricity supply.
  • These details let communities assess benefits alongside demands placed on the system.

The same principle applies to efficiency claims.

  • Lower energy use per computing task can be valuable, but it does not establish that a growing facility’s total demand will fall.
  • Public reporting needs both efficiency indicators and absolute consumption so that expansion remains visible.

For an African utility considering a major new customer;

  • A practical assessment would examine who pays for connection and network reinforcement, how demand changes over time, and what supply is available during constrained periods.
  • These are questions for local analysis; the US findings do not answer them automatically.

There is also an opportunity to plan cleaner supply early.

  • Developers and authorities can assess additional generation, operational flexibility and transparent procurement before a project creates long-lived commitments.

Accompany the announcement of renewable purchases with an explanation of how those purchases relate to actual electricity needs.

Require evidence at facility level

Developers should disclose enough information for regulators and communities to evaluate electricity consumption and sourcing.

Commercial confidentiality need not prevent publication of meaningful aggregate operating data or independently checked environmental indicators.

Public authorities can ask for clear boundaries:

  • Does an emissions figure cover electricity only, or also construction and backup generation?
  • What period does it describe? Is consumption observed or modelled?
  • Comparable answers make sustainability claims more useful.

The researchers warn that expansion since April 2025 may mean the present footprint is larger.

This remains a warning about a changing sector, rather than a new quantified estimate for 2026.

Path Forward – Measuring growth before infrastructure commitments deepen

The study strengthens the case for transparent electricity and emissions reporting at individual facilities.

Its scope and uncertainty should travel with its headline numbers.

African infrastructure planning can apply those questions locally, linking digital ambitions to credible power supply and clearly allocated system costs.